National Repository of Grey Literature 23 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
Construction-technological stage of founding an apartment building in Uherské Hradiště
Pelka, Jiří ; Nečasová, Barbora (referee) ; Diaz, Yvetta (advisor)
The goal of this bachelor thesis is to create the building-technological project of the apartment building substructure in Uherske Hradiste. The building is based on drilled piles, reinforced foundation strips and a foundation slab. The thesis contains a technical report, construction logistics, technological specifications for earth works and foundation constructions, an inspection and test plans. There is also provided item budget including bill of quantities, a construction schedule, a machine assembly proposal, design of the site equipment including the technical report and occupational safety and health protection.
Polyfunctional Complex Houbalova in Brno, Gross Substructure
Kolouch, David ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This work focuses on the rough substructure of the polyfunctional complex in Brno, which is based on pilots in complex foundation conditions. The thesis solves the construction from the point of view of construction technology. Part of the work are a timetable, an itemized budget with a report, building site equipment and workflows.
Foundation of Bridge
Ščudla, Martin ; Štefaňák, Jan (referee) ; Masopust, Jan (advisor)
The thesis focuses on design of 5 - square bridge foundation in Ostrava Svinov including covering of construction pits. The bridge is founded on the groups of drilled large diameter piles. Design and assessment is realized in program GEO 5. The thesis is divided into 6 parts: introduction, geotechnical circumstances, concomitant report, static calculations, technical report and documentation.
Analysis of pile load test
Ponížil, Cyril ; Kotačková, Alena (referee) ; Fiala, Radek (advisor)
There is ussualy used the Masopust's method to assessment the piles in Czech Republic. This method is based on statistical processing of large data set of load piles tests. Due to the using of regression coefficients this method is relatively complicated and not very transparent. Instead, foreign standards ussualy use direct the values of limit stress on the base of piles and unit friction capacity. Procedure for determining the bearing capacity of the piles is thus considerably simplified. In this thesis the Masopust's method is compared with the methods used in Germany and Austria. This comparison provides insight to the safety level that include various approaches.
Kabeltechnik Mikulov - construction and technological preparation
Dvořáková, Michaela ; Novotný, Michal (referee) ; Biely, Boris (advisor)
The subject of my diploma thesis is the technology of steel production hall and brick administrative building in the komplex of Kabeltechnik compalny in Mikulov. Thesis deals with design of construction site, construction and technological study of construction of steel manufacturing hall, items budget according to project documentation, financial and time planing, proposal of suitable mechanical assembly including lifting mechanisms, safety of work, environmental plan and monitoring and test planing.
Sadova, Apartment building M1 - construction technology project
Štěrba, Marek ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is construction-technological project of the whole construction focusing on the main building object - Apartment building, which is based on large-diameter drilling piles. The basis of the work is the budget of the main building and its timetable. Part of the thesis is a solution of organization of construction and design of building site equipment, technological regulation of selected activities, quality control and solution of transport relations including oversized transport. In addition, the design of the machine assembly, assessment of lifting mechanisms, safety and health protection and protection of the environment are solved.
Construction technological project of construction of an administrative building with garages
Hrabovský, Lukáš ; Nečasová, Barbora (referee) ; Diaz, Yvetta (advisor)
The subject of this diploma thesis is the elaboration of a construction technological project for the construction of an administrative building with garages in Prague. The building is located in an enclosed area in the Prague-Veleslavín district. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, a technological regulation for the implementation of monolithic ceiling structures, a quality control and testing plan for monolithic ceiling structures. The diploma thesis also includes the calculation of construction according to THU, a occupational health and safety plan, concreting economics, a noise study, a selected points LEED certification and a budget with site equipment costs.
Securing of Foundation Pit CARLA in Brno
Novák, Michal ; Boštík, Jiří (referee) ; Svoboda, Petr (advisor)
The topic of the master’s thesis is the statically compliant and economical design of the ensuring of foundation pit for building Carla Brno. The calculation part will be solved through program GEO5. The part of this thesis is also to describe the technological process of implementing elements and the relevant project documentation.
Construction-technological stage of the foundation of a multifunctional house in Řečkovice
Hrabovský, Lukáš ; Liška, Pavel (referee) ; Diaz, Yvetta (advisor)
The subject of this bachelor's thesis is the elaboration of a construction technology project for the foundation of a multifunctional house in Řečkovice. The building is located in the built-up area of the Brno-Řečkovice district. The multifunctional house is based on piles and a foundation slab. The content of the work is the elaboration of an accompanying and technical report, technological regulations, design of machinery, control and test plans, time schedule, wider transport relations, solution of construction site equipment, safety and health at work, itemized budget, including statement of acreage.
Construction technology project of an apartment building in the Pod Svahy II locality in Uherské Hradiště
Pelka, Jiří ; Nečasová, Barbora (referee) ; Diaz, Yvetta (advisor)
The goal of this master thesis is to create the building-technological project of the apartment building in Uherske Hradiste. Specifically it is focused on the building SO 01. The thesis contains a technical report for the construction-technological project, the solution of construction logistics, the object time and financial plan, a study of the implementation of the main technological stages, a technological specifications for monolithic structures, an inspection and test plan for monolithic structures, a project of the construction site equipment, a timetable for the rough construction, a design of the machine assembly and its assessment, a plan for securing resources for the rough construction. There is also provided item budget including a bill of quantities and supporting statements, a BIM model of the rough construction facility, noise study, formwork drawings and detail.

National Repository of Grey Literature : 23 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.